Gut Renovation Cost Calculator: what to expect
A gut renovation strips a home or unit back to the studs, replacing every system and finish. Because demolition and rough-ins dominate the early budget, gut jobs carry the highest waste and contingency factors of any remodel.
Across the United States, a gut renovation cost averages $345,321 once mid-range materials, licensed labor, and standard permits are included. The figures below are a national baseline; pick your state or city to apply local labor rates, material delivery costs, and permit fees.
Cost summary
| Low estimate | $163,574 |
|---|---|
| Average estimate | $345,321 |
| High estimate | $751,639 |
| Cost per sqft | $109 - $501 |
| Timeline | 12-36 weeks |
Where the money goes
For a typical gut renovation cost, the average $345,321 estimate splits into roughly $140,172 of materials, $134,078 of labor, and $3,600 in permits.
| Material cost | $140,172 |
|---|---|
| Labor cost | $134,078 |
| Permit cost | $3,600 |
What a gut renovation cost includes
- Full demolition down to studs and subfloor
- New electrical, plumbing, and HVAC rough-ins
- Insulation, drywall, and all new finishes
- New kitchen, bathrooms, flooring, and trim
- Extensive permitting and staged inspections
What drives the cost the most
- Demolition volume and debris hauling front-load the budget.
- Every system is replaced, so rough-in labor is a major line.
- Hidden conditions (rot, knob-and-tube, failed plumbing) surface once walls open.
- Higher waste factor and contingency are built in by necessity.
Budget, standard, and high-end scopes
The $163,574–$751,639 range maps to three common levels of finish:
| Scope | Roughly | What it covers |
|---|---|---|
| Single space | $163,574 | One floor or unit taken to studs. |
| Whole home | $345,321 | Entire house gutted and rebuilt inside the existing shell. |
| Gut + reconfigure | $751,639 | New layout on top of full system replacement. |
How to save on a gut renovation cost
- Order a thorough pre-demo inspection — gut jobs reward early discovery.
- Carry 15%+ contingency; opened walls almost always reveal added work.
- Salvage and resell or donate fixtures to offset demolition cost.
How this estimate is calculated
We start from a base cost-per-sqft for gut renovation cost and adjust it for finish quality, labor complexity, waste, and equipment, then apply national baseline indices. The figures update with the cost data and reflect mid-range, licensed-contractor pricing, not a binding quote.